Skip to content

Carpets, upholstery and hard floors — restored.

Hot-water extraction for fibre, strip-seal-and-polish for hard floors. The right method for what’s underfoot, on a same-week slot.

4-6 hour drying Receipt for letting agents Stain pre-treatment included
Methods

Three techniques, picked to match the floor.

Every job starts with a fibre or surface test, so we use the method that lifts the dirt without lifting the carpet pile or sealing the stone the wrong way.

M-01

Hot-water extraction

Truck-mount-grade kit, pre-treatment, agitation and rinse. Lifts ground-in dirt and pet residue without saturating. Drying window 4–6 hours.

Best for: wool & synthetic carpets, rugs, upholstery, post-tenancy resets.
M-02

Low-moisture encapsulation

Crystalline-detergent system that captures soiling and vacuums away once dry. Touch-dry in under an hour — handy for offices on Monday-morning turnarounds.

Best for: commercial-grade carpets, office maintenance, between-tenants quick resets.
M-03

Strip, seal & polish

Multi-pass treatment for vinyl, LVT, terrazzo and natural stone. Removes years of build-up, then re-seals to the floor manufacturer’s spec.

Best for: kitchens, reception areas, healthcare hard floors, listed buildings with stone.
M-04

Hard wood & engineered care

pH-neutral clean, scratch-fill and finish-coat where the lacquer allows. Buffed dry — no sticky residue, no swelling at the joints.

Best for: Victorian terraces, period offices, engineered LVT in retail.
Hot-water extraction wand cleaning a pale living-room carpet, leaving a freshly cleaned stripe
What we treat

From hallway runner to surgery floor.

  • Wool, synthetic & mixed-fibre carpets
  • Rugs (Persian, kilim, viscose — by tag)
  • Sofas, armchairs & dining seats
  • Mattresses & headboards
  • Vinyl, LVT & safety flooring
  • Natural stone, terrazzo, marble
  • Engineered & solid hardwood
  • Polished concrete & epoxy
Drying & aftercare

What to expect after we leave.

Hot-water extraction

4–6 hours

Touch-dry in 4, fully dry in 6 with normal ventilation. Walk on with socks once dry.

Encapsulation

~ 60 minutes

Touch-dry inside an hour. Ideal for offices reopening the next morning.

Hard-floor seal

2–4 hours

Keep clear of foot traffic until the final coat has cured.

Ready when you are

Stain you can’t shift?

Send us a photo over WhatsApp. We’ll tell you honestly whether it’s a quick treatment or a full extraction job.

Accredited & insured
SafeContractor Approved£5m Public LiabilityBased in Oxford